Do cost estimation for the designed parking space as shown in the diagrams (you

Place your order now for a similar assignment and have exceptional work written by our team of experts, At affordable rates

For This or a Similar Paper Click To Order Now

Do cost estimation for the designed parking space as shown in the diagrams (you can use the boq estimates in your country , convert them to pounds)
design description
Researches on multi-storey car parks show that water that cannot be removed quickly damages the building structurally. Chemically, water containing chloride ions causes great damage to the building surface. In order for the buildings to last longer, great importance should be given to the drainage system.
Drainage
A well-designed drainage system is required in order to quickly remove the water coming from outside without accumulating on the surface. In the UK, drainage is designed to BS 83019.1 and BS EN 120569.2, and in other countries local standards will apply. In the UK the drainage is designed to BS 83019.1 and BS EN 120569.2 and in other countries local standards will apply.
The top floor is the area most exposed to water, so local precipitation statistics were taken into account when designing the drainage system. It is normal for puddles to form in storm conditions and should be removed as soon as possible. Water comes to the intermediate floors partially from the side facades and as a result of the transportation of vehicles. Since the car park is warmer than outside, the ice on the vehicle melts and causes puddles, a vehicle can carry an average of 2 litters of water. These waters must be transmitted to the drainage system as soon as possible.
Figure 1(NW3 Weather – Rain Detail, n.d.-b)
33.3 mm/h X 48.6 m X 125 m = 0.056 m^3 / second
0.056 (m^3/second) / 1.5 = 0.085 m^3/second
When the London rain data is examined, it is seen that the maximum rain in one hour is 33.3 mm. In order to calculate using this data, the surface area of the car park is found and then multiplied by the maximum rain rate. The result is 0.056 M^3/second. When the safety factor is taken as 1.5, it is seen that 0.085 M^3/second or 85 litter/second of rain accumulates on the top floor. In the designed drainage system, this amount will be removed from the roof as soon as possible by pipes.
While the drainage system was designed for the upper floor, it was planned to put stainless steel drainage channels between the car parks. Pipes that provide water transfer will be used in one of every 2 columns to ensure water transmission to the lower floor. It is planned to use 3 rows of drain channels for typical floor floors, 2 channels of 72 meters will be used for long rows and 21.6 meters of channels will be used for short rows. Three 72-meter-long drainage channels, one 28.8-meter-long drainage channel and 2 14.4-meter-long drainage channels will be used on the ground floor. As a result, 266.6(ground floor) + 3 (floor) X 165.8 (typical floor) = 763.4 meters drainage channel will be used for the multi-storey car park planned for 3 floors.
For the parking spaces on the sides, a deck will be placed in the middle of both columns to provide water drainage. As a result, each floor will have 24 decks and the multi-storey car park will have a total of 24 X 3 = 72 decks.
Ramps
Since the ramps are inclined, they are a way for the water to flow to the lower floors. In order to prevent this, drainage channels should be placed at the beginning and end parts of the ramps, otherwise the water from the upper floors will go towards the lower floors. In addition, the ramps should remain as dry as possible because access to the lower / upper floors is provided by these roads. In a possible wet/freezing situation, the risk of accidents arises. Therefore, the ramps should be cut with drainage channels and water drainage should be provided.
The drainage lengths to be placed at the start and end areas of the ramps are designed to be 3.65 meters, and since there are 6 ramps in total, there should be 6 (ramps) X 2 (start – end) X 3.65 = 48.8 meters drainage channel.
Pedestrian areas
When designing the drainage system, it should be designed in such a way that it prevents the water coming from outside to go to the stairs and elevator shaft. It should be designed in such a way that pedestrians will not trip or fall during this design.
Piping systems
Pipes are the most important transmission parts of the drainage system, during this design they must be positioned so that they are not damaged. Since it is not possible for downpipes to pass through the column, they should be placed on the protective side of the column, thus preventing possible accidents.
The water discharged from the decks and the drainage channel is conveyed to the lower floors by means of pipes, following the nearest branch. The distance required to reach the nearest columns from the decks was found by a simple geometric calculation of 4.2 meters. Since there are 24 decks on each floor, 4.2 X 24 X 3 = 302 meters of pipe is not required. In addition, the water in the drainage channels on each floor should be directed to the nearest column and the distance required for this is 4.2 meters. Pipe should be used to discharge the water coming from the 26 drainage channels on each floor and its end. It is 302 meters. The amount of pipe to be used for the upper floors is 604 meters.
Interceptors
Oil and oil are sometimes mixed into surface waters as a result of leaks from vehicles. After this mixture is collected through drainage channels, oil and petroleum must be removed before it is given to the sewer system. For this, the stoppers must be located outside the car park or in an easy-to-maintain location within the building.

For This or a Similar Paper Click To Order Now

SmiteWriter
Calculate your paper price
Pages (550 words)
Approximate price: -

Why Work with Us

Top Quality and Well-Researched Papers

We always make sure that writers follow all your instructions precisely. You can choose your academic level: high school, college/university or professional, and we will assign a writer who has a respective degree.

Professional and Experienced Academic Writers

We have a team of professional writers with experience in academic and business writing. Many are native speakers and able to perform any task for which you need help.

Free Unlimited Revisions

If you think we missed something, send your order for a free revision. You have 10 days to submit the order for review after you have received the final document. You can do this yourself after logging into your personal account or by contacting our support.

Prompt Delivery and 100% Money-Back-Guarantee

All papers are always delivered on time. In case we need more time to master your paper, we may contact you regarding the deadline extension. In case you cannot provide us with more time, a 100% refund is guaranteed.

Original & Confidential

We use several writing tools checks to ensure that all documents you receive are free from plagiarism. Our editors carefully review all quotations in the text. We also promise maximum confidentiality in all of our services.

24/7 Customer Support

Our support agents are available 24 hours a day 7 days a week and committed to providing you with the best customer experience. Get in touch whenever you need any assistance.

Try it now!

Calculate the price of your order

Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Place your order

Fill in the order form and provide all details of your assignment.

Proceed with the payment

Choose the payment system that suits you most.

Receive the final file

Once your paper is ready, we will email it to you.

Our Services

No need to work on your paper at night. Sleep tight, we will cover your back. We offer all kinds of writing services.

Essays

Essay Writing Service

No matter what kind of academic paper you need and how urgent you need it, you are welcome to choose your academic level and the type of your paper at an affordable price. We take care of all your paper needs and give a 24/7 customer care support system.

Admissions

Admission Essays & Business Writing Help

An admission essay is an essay or other written statement by a candidate, often a potential student enrolling in a college, university, or graduate school. You can be rest assurred that through our service we will write the best admission essay for you.

Reviews

Editing Support

Our academic writers and editors make the necessary changes to your paper so that it is polished. We also format your document by correctly quoting the sources and creating reference lists in the formats APA, Harvard, MLA, Chicago / Turabian.

Reviews

Revision Support

If you think your paper could be improved, you can request a review. In this case, your paper will be checked by the writer or assigned to an editor. You can use this option as many times as you see fit. This is free because we want you to be completely satisfied with the service offered.